Lovato controllers handle automatic changeover between mains and generator, power factor correction and simple automation. We program and set up Lovato smart relays and controllers in new and existing panels.
Lovato Electric PLCs we work on
- Smart relays: programmable relays for pumps, lighting and small machines
- Automatic transfer switch controllers: mains/generator changeover control
- Power factor controllers: automatic capacitor bank control
Software: Lovato configuration software for each device family. Networks: Modbus RTU and Ethernet options for monitoring.
Lovato Electric PLC services
- Smart relay programs for pumps, tanks and lighting
- Generator changeover controller setup and testing
- Power factor controller setup for capacitor banks
- Monitoring over Modbus
Signs your PLC system needs attention
- The machine stops with faults nobody can explain, or the only person who understood the program has left
- There is no current backup of the program, or the backup does not match what is running
- Spare CPUs and I/O cards are discontinued, expensive or months away
- Operators work around the sequence by hand because the logic no longer matches the process
- You want production data, remote access or new functions that the old program cannot provide
How we approach a PLC job
- Upload and back up the running program and hardware configuration before any change.
- Document the I/O and the sequence with your operators, so everyone agrees what the machine must do.
- Write or modify the logic offline, structured and commented, and test it with simulation where possible.
- Commission on site: test every input, output, interlock and alarm, then run under real production load.
- Hand over the final program, I/O list and drawings, and train your technicians on fault finding.
Tips from our engineers
Test the changeover under load
A transfer switch controller that works on the bench can still fail on site. We test mains failure, generator start, transfer and return with the real load.
Set the power factor target with your tariff
Setting the target power factor and step timing to suit your tariff avoids penalties without over-correcting.
Related guides
See also Lovato Electric PLC, HMI and drive services overview, Lovato Electric VFD programming and commissioning, our PLC service page.
Frequently asked questions
Can you set up Lovato changeover controllers?
Yes. We configure and test Lovato automatic transfer switch controllers for mains and generator systems.